 |
INFRASTRUCTURAL AND UTILITIES INTEGRATION
• Plantations: existing set up or new development
• Rural: project-level or clusters
In respect of project planning and development, and integrated water resource management through the harnessing, treatment and refurbishing of industrial and domestically-generated wastewaters and spent waters in a design-by-intent optimized configuration that involves the following:
- The siting and design of palm oil mills and factories, plantation hubs and buildings
- Primary water sourcing and treatment
- Wastewater/ sewage treatment and sanitation
- Water reuse: recycling, storage. distribution. reticulation, wasting
- Drainage, irrigation, flood control, water conservation, water-table maintenance for increased crop yields and agricultural productivity
- Water autonomy through site specificity and local adaptability
- Closed-loop water recirculation for aquaculture. Etc
Biogas recovery for heat and power production |
|
|
 |